Поиск
  • Iki Z

Large project finished - TCO's Orken village


We have completed the design on utility networks for the new TengizChevrOil facility - the village Orken.

The construction of the shift camp is designed for the simultaneous residence of 5000 people in it, who will carry a round-the-clock watch on extraction of "black gold" here. The construction of Orken should be completed in one and a half to two years.

Within the framework of the design, we developed following sections of the project:

- Communication and data transmission system for al

l buildings;

- IP telephony system of the facility;

- Wireless network;

- Security and fire alarm;

- Security and video surveillance system;

- Emergency notification system;

- Automatic control system of utility networks - ACS.

The main challenge of the project was the development of all documentation in accordance with international standards, as well as the strictest rules of TCO.


Просмотров: 0
ELA Design - Engineering
Astra Group of Companies

17, Samal, Almaty, Kazakhstan

13, Gastello str., Kagarandy, Kazakhstan

5, Comfort Town, 38 str., Astana, Kazakhstan

Астана/Алматы/Караганда - Казахстан

/ +7 700 350 6620

/ +7 721 250 6620

// info@ela.kz or 

// info@astra-group.kz

Send Us a Message
If you applying this form, be sure - we will answer in 24 hours.
Если Вы хотите воспользоваться данной формой, будьте уверены - мы ответим в течение 24 часов

© 2006-2020 by ELA, Astra - Group company